Project status

  1. Project Design
  2. Community Consultation
  3. Planning Application Submission
  4. Planning Application Decision
  5. Construction
  6. Operational
  • Where

    Upminster, London

  • What

    Battery energy storage

  • Network Connection Capacity

    57 MW

  • Equivalent household power use

    114,000 homes for 2 hours when fully charged

  • Annual CO2 emissions saved

    13,680 tonnes

  • Targeted Operational Date

    2024

  • Project Development Size

    0.4 hectares

  • Project Lifespan

    40 years

The Warley Battery Energy Storage  project is located at Upminster on the outskirts of East London. The project is on National Grid land adjacent to its 275kV Warley substation. It will connect directly to the London electricity distribution circuit and serve to balance supply and demand in London. 

Bee

Biodiversity benefits

The site includes a 7 metre buffer of new shrub and tree planting which both screens the batteries from a nearby bridleway and encourages biodiversity gain in a predominantly arable area.

Planting will be a diverse mix of native British species and include mature trees to quickly support biodiversity growth on the site. A quarter of the site will be planted with wildflowers to encourage insects and pollinators to the site. Bird and insect boxes will be installed along the site boundary to support a range of bird and insect species.

Explore our projects

Clearstone Energy – Dragon’s Green Energy Hub

Public Consultation Brochure

Read more

WilloWS GREEN SOLAR FARM – CABLE ROUTE proposal

Detailed project overview

Read more

Axminster Energy Hub Public Consultation

Axminster Energy Hub is a significant energy infrastructure project that will modernise the local electricity grid to support the transition […]

Read more

Worset Lane Energy Hub- 200MW battery energy storage project

Worset Lane is a large scale battery energy storage project that will be built on land adjacent to National Grid’s Hartmoor 275 kV high voltage substation near Hartlepool.

Read more

Junction 27 Energy Hub – 400MW battery energy storage project

Clearstone Energy has secured a grid connection at Tiverton for a battery energy storage project. We are in the process of sharing our proposal with the local community for their input.

Read more

Axminster Energy Hub – 150 MW battery energy storage project

Clearstone Energy has secured a connection at National Grid’s Axminster Substation, located 4km to the east of Axminster, for a battery energy storage project.

Read more

Sundon Energy hub – 49.5 MW battery energy storage project

The Sundon Battery Energy Storage project will be one of the first sites to connect under the National Grid’s Energy Park programme.

Read more